{"id":972,"date":"2026-10-06T11:09:12","date_gmt":"2026-10-06T11:09:12","guid":{"rendered":"https:\/\/simutecra.com\/blog\/?p=972"},"modified":"2026-10-06T11:09:15","modified_gmt":"2026-10-06T11:09:15","slug":"digital-twins-vs-bim-guide","status":"publish","type":"post","link":"https:\/\/simutecra.com\/blog\/digital-twins-vs-bim-guide\/","title":{"rendered":"Digital Twins vs BIM: What&#8217;s the Difference?"},"content":{"rendered":"\n<p>A university&#8217;s facilities team, managing a newly completed engineering building, pulled up the project&#8217;s handover BIM model to investigate a complaint about uneven temperatures on the third floor. The model showed exactly what it was designed to show: the HVAC system&#8217;s design specification, the ductwork layout, and the as-built equipment schedule, accurate as of the day the building was handed over fourteen months earlier.<\/p>\n\n\n\n<p>What it couldn&#8217;t show was why the third floor was currently running warm, because the model had no connection to anything happening in the building right now. No current sensor readings, no live equipment status, no record of how performance had drifted since handover. The facilities team&#8217;s next step was the same one teams have used for decades: send a technician to manually check dampers, sensors, and control settings floor by floor, a process that took four days to isolate a single miscalibrated VAV box damper that had been slowly drifting out of setpoint since month three.<\/p>\n\n\n\n<figure class=\"wp-block-table has-medium-font-size\"><table class=\"has-background\" style=\"background-color:#ebf5fa;border-style:none;border-width:0px\"><tbody><tr><td><\/td><td class=\"has-text-align-left\" data-align=\"left\"><strong>Quick answer:<\/strong> BIM and digital twins are not competing technologies, and a digital twin is not simply a more advanced or renamed version of BIM. BIM is a static, point-in-time model answering what a building was designed and built to be. A digital twin is a live, continuously updated representation connected to real-time sensor data, answering what a building is actually doing right now, and increasingly, what it&#8217;s likely to do next. The most effective digital twins are built directly on top of an accurate BIM model, making the two sequential stages of the same digital representation rather than alternative choices.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Side-by-side-comparison-of-a-static-BIM-model-and-a-live-digital-twin-showing-the-same-chiller-with-fixed-specification-data-versus-real-time-operational-dashboard-data.png\" alt=\"Side-by-side comparison of a static BIM model and a live digital twin showing the same chiller with fixed specification data versus real-time operational dashboard data\" class=\"wp-image-974\" srcset=\"https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Side-by-side-comparison-of-a-static-BIM-model-and-a-live-digital-twin-showing-the-same-chiller-with-fixed-specification-data-versus-real-time-operational-dashboard-data.png 1536w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Side-by-side-comparison-of-a-static-BIM-model-and-a-live-digital-twin-showing-the-same-chiller-with-fixed-specification-data-versus-real-time-operational-dashboard-data-300x200.png 300w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Side-by-side-comparison-of-a-static-BIM-model-and-a-live-digital-twin-showing-the-same-chiller-with-fixed-specification-data-versus-real-time-operational-dashboard-data-1024x683.png 1024w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Side-by-side-comparison-of-a-static-BIM-model-and-a-live-digital-twin-showing-the-same-chiller-with-fixed-specification-data-versus-real-time-operational-dashboard-data-768x512.png 768w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<p>This article covers the core differences between BIM and digital twins, the five-stage evolution from a static model to a fully autonomous twin, guidance on when each is the right tool, and worked examples showing the distinction in practice.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Defining the Two Terms Precisely<\/h2>\n\n\n\n<p><a href=\"https:\/\/simutecra.com\/blogs\/what-is-bim-building-information-modeling\/\" data-type=\"link\" data-id=\"https:\/\/simutecra.com\/blogs\/what-is-bim-building-information-modeling\/\">Building Information Modeling (BIM)<\/a> is the process of creating and managing a structured, element-based digital representation of a building&#8217;s physical and functional characteristics, used primarily to support design, coordination, and construction decision-making. A BIM model is authoritative about <a href=\"https:\/\/simutecra.com\/blogs\/reduce-cad-rework-design-intent\/\" data-type=\"link\" data-id=\"https:\/\/simutecra.com\/blogs\/reduce-cad-rework-design-intent\/\">design intent<\/a> and <a href=\"https:\/\/simutecra.com\/blogs\/as-built-drawings-explained\">as-built condition<\/a>: what a building was designed to be, and at LOD 500, what was actually built.<\/p>\n\n\n\n<p>A digital twin, in building and infrastructure contexts, is a live, continuously updated digital representation of a physical asset, connected to that asset through real-time or near-real-time data. This lets the digital representation reflect the asset&#8217;s actual current state and, in more advanced implementations, support prediction and even automated control of the physical asset. A digital twin is authoritative about current operational reality.<\/p>\n\n\n\n<p>The two definitions aren&#8217;t competing; they describe different relationships between a digital model and physical reality. A BIM model is a snapshot, accurate as of a specific point in time, updated deliberately at defined milestones. A digital twin is a live connection, continuously reflecting whatever the building&#8217;s sensors report at this moment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Six Core Differences Between BIM and Digital Twins<\/h2>\n\n\n\n<p>These six dimensions, moving from the most fundamental to the more technical, give a practical picture of how the two actually differ in day-to-day use.<\/p>\n\n\n\n<figure class=\"wp-block-table has-medium-font-size\"><table><thead><tr><th>Aspect<\/th><th>BIM<\/th><th>Digital Twin<\/th><th>Example<\/th><\/tr><\/thead><tbody><tr><td>Primary purpose<\/td><td>Design, document, and coordinate construction, concept through as-built handover<\/td><td>Monitor, analyse, and predict ongoing operational behaviour after occupancy<\/td><td>BIM coordinates ductwork before installation; a twin tracks that same ductwork&#8217;s airflow five years into occupancy<\/td><\/tr><tr><td>Data currency<\/td><td>Represents a point-in-time condition, updated at formal revisions or renovations<\/td><td>Continuously updated with live data, reflecting real-time conditions<\/td><td>BIM shows a chiller&#8217;s design spec; a twin shows that chiller&#8217;s actual real-time energy draw and fault status<\/td><\/tr><tr><td>Data direction<\/td><td>One-directional: data flows into the model, little or none flows back out<\/td><td>Bidirectional: sensor data flows in, and in advanced twins, commands flow back out to control systems<\/td><td>A twin can trigger an automatic HVAC adjustment; a BIM model has no mechanism to affect the physical building<\/td><\/tr><tr><td>Typical lifecycle stage<\/td><td>Concept design through construction and handover, ending at LOD 500<\/td><td>Building operation, often spanning decades after construction<\/td><td>A hospital&#8217;s BIM model is finalized at handover; its twin then operates continuously for the building&#8217;s 40+ year life<\/td><\/tr><tr><td>Underlying technology<\/td><td>3D modelling and coordination platforms (Revit, Navisworks)<\/td><td>IoT sensors, real-time data integration, analytics, and increasingly AI\/ML, built on a 3D base<\/td><td>A BIM platform manages static model elements; a twin platform manages a continuous stream of sensor readings<\/td><\/tr><tr><td>Value delivered<\/td><td>Reduces design conflicts, rework, and delays during design and construction<\/td><td>Reduces operational cost, energy waste, downtime, and maintenance inefficiency<\/td><td><a href=\"https:\/\/simutecra.com\/blogs\/bim-clash-detection-guide\/\" data-type=\"link\" data-id=\"https:\/\/simutecra.com\/blogs\/bim-clash-detection-guide\/\">BIM prevents a duct-beam clash<\/a> before construction; a twin flags that duct&#8217;s airflow degrading years later<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">The Data Direction Difference Is the Most Consequential<\/h3>\n\n\n\n<p>Of these six differences, data direction, one-directional for BIM, bidirectional for a mature digital twin, carries the largest practical consequence. It&#8217;s what separates a true digital twin from being simply &#8220;BIM with a live dashboard attached.&#8221; A monitored twin that only displays live data without acting on it is a valuable but limited tool, essentially a sophisticated visualisation layer. The genuinely transformative applications, automated demand response, self-optimising HVAC control, predictive maintenance that schedules its own work orders, all depend on bidirectional capability that lets the digital representation influence the physical building, not just observe it.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">From Static BIM to Autonomous Digital Twin: A Five-Stage Evolution<\/h2>\n\n\n\n<p>Most buildings&#8217; digital representations progress through stages, each adding a distinct capability on top of the previous one, rather than making a binary choice between &#8220;BIM&#8221; and &#8220;digital twin.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-table has-medium-font-size\"><table class=\"has-fixed-layout\"><thead><tr><th>Stage<\/th><th>Description<\/th><th>Capability Unlocked<\/th><\/tr><\/thead><tbody><tr><td>1. Static BIM model<\/td><td>A fixed, element-based model with no live data connection<\/td><td>Design coordination, clash detection, documented as-built record<\/td><\/tr><tr><td>2. Connected (asset-linked) BIM<\/td><td>The as-built model linked to static asset and maintenance data<\/td><td>Facilities teams locate equipment info directly through the model<\/td><\/tr><tr><td>3. Monitored digital twin<\/td><td>The connected model linked to live sensor and BAS\/BMS data<\/td><td>Live dashboards and alerts when a parameter moves outside threshold<\/td><\/tr><tr><td>4. Predictive digital twin<\/td><td>Historical data used to build models forecasting future behaviour<\/td><td>Predictive maintenance scheduling and early failure warning<\/td><\/tr><tr><td>5. Autonomous \/ prescriptive twin<\/td><td>A live control interface lets the twin issue commands, not just receive data<\/td><td>Automated, continuously optimised building system operation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Why Skipping Stages Rarely Works<\/h3>\n\n\n\n<p>Owners occasionally try to procure a predictive or autonomous twin (stages 4 or 5) without first establishing a solid connected BIM foundation (stages 1 and 2), usually because prediction and automation are the most visible part of the pitch. This consistently underperforms, since predictive analytics need historical data accumulated over time, and that data is far more useful tied to accurate, well-classified building elements from a solid BIM foundation than existing as disconnected sensor readings with no spatial or asset context.<\/p>\n\n\n\n<p>The university engineering building shows this dependency directly. The four-day diagnostic process was only shortened by connecting live data to the existing, accurate BIM model of the ductwork and VAV boxes. Without that model as a foundation, live sensor data alone would tell a facilities team a damper was misbehaving without easily showing them where it was or what it connected to.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Five-stage-evolution-diagram-from-static-BIM-model-to-autonomous-digital-twin-showing-the-risk-of-skipping-the-connected-and-monitored-foundation-stages.png\" alt=\"Five-stage evolution diagram from static BIM model to autonomous digital twin, showing the risk of skipping the connected and monitored foundation stages\" class=\"wp-image-975\" srcset=\"https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Five-stage-evolution-diagram-from-static-BIM-model-to-autonomous-digital-twin-showing-the-risk-of-skipping-the-connected-and-monitored-foundation-stages.png 1536w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Five-stage-evolution-diagram-from-static-BIM-model-to-autonomous-digital-twin-showing-the-risk-of-skipping-the-connected-and-monitored-foundation-stages-300x200.png 300w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Five-stage-evolution-diagram-from-static-BIM-model-to-autonomous-digital-twin-showing-the-risk-of-skipping-the-connected-and-monitored-foundation-stages-1024x683.png 1024w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Five-stage-evolution-diagram-from-static-BIM-model-to-autonomous-digital-twin-showing-the-risk-of-skipping-the-connected-and-monitored-foundation-stages-768x512.png 768w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">When BIM Alone Is Enough, and When a Digital Twin Earns Its Cost<\/h2>\n\n\n\n<p>Not every building or use case justifies investing beyond a well-executed, connected BIM model.<\/p>\n\n\n\n<figure class=\"wp-block-table has-medium-font-size\"><table><thead><tr><th>Use Case<\/th><th>Is BIM Alone Sufficient?<\/th><th>Recommendation<\/th><\/tr><\/thead><tbody><tr><td>Design coordination and clash detection during construction<\/td><td>Yes, this is exactly what BIM is designed for<\/td><td>Use standard BIM coordination; a twin has no role before the building is operational<\/td><\/tr><tr><td>Facilities handover and initial asset documentation<\/td><td>Largely yes, with a connected BIM model<\/td><td>Treat a well-structured handover as digital twin readiness, not a full twin<\/td><\/tr><tr><td>Ongoing energy management and equipment performance monitoring<\/td><td>No, a static model can&#8217;t show current consumption or status<\/td><td>Justified for buildings with meaningful energy spend or equipment criticality<\/td><\/tr><tr><td>Predictive maintenance for critical equipment (chillers, generators, medical equipment)<\/td><td>No, prediction requires historical trend data and analytics<\/td><td>Strongly justified where unplanned downtime carries high cost, like hospitals and data centres<\/td><\/tr><tr><td>Portfolio-wide space utilisation and occupancy planning<\/td><td>Partially; BIM provides spatial data but not usage patterns over time<\/td><td>Justified for large portfolio owners actively managing space allocation costs<\/td><\/tr><tr><td>Automated, self-optimising building system control<\/td><td>No, static models have no mechanism to observe or control live systems<\/td><td>Justified only for owners with the operational scale and technical maturity to manage it<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Matching Investment to Building Criticality and Scale<\/h3>\n\n\n\n<p>The clearest pattern across these use cases: digital twin investment is justified in proportion to how expensive the consequences of not knowing current operational status actually are, and how much scale exists to spread the sensor and platform investment across. A single small office building with modest energy spend has a much weaker case for a predictive twin than a hospital with critical medical equipment and continuous occupancy, or a large campus where the same monitoring platform serves dozens of buildings at once. Size the investment to the specific operational risk and scale of the portfolio, not as a general technology upgrade disconnected from a problem it&#8217;s meant to solve.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Worked Examples<\/h2>\n\n\n\n<p><strong>A hospital&#8217;s critical equipment digital twin:<\/strong> A 400-bed hospital had a complete, accurate BIM model of its central plant and medical gas systems, maintained through several years of minor renovations. Despite the accurate model, the facilities team experienced two unplanned chiller failures in eighteen months, each requiring emergency rental chiller deployment at significant cost, because the existing preventive maintenance programme was based on fixed time intervals rather than actual condition.<\/p>\n\n\n\n<p>The hospital connected its three central plant chillers to a monitored digital twin platform built on the existing BIM model, adding vibration, temperature, and electrical load sensors and feeding that data into an analytics platform trained on historical performance and failure data, reaching stage 4 (predictive) in the evolution above.<\/p>\n\n\n\n<p>Within the first year, the predictive twin flagged a developing bearing wear pattern on one chiller fourteen days before the vibration signature reached the threshold that would previously have gone undetected until failure. This let the facilities team schedule a planned repair during a low-demand period instead of experiencing an emergency failure. The facilities director credited the twin with avoiding at least one of the emergency rental deployments that had cost more than the twin implementation itself.<\/p>\n\n\n\n<p><strong>A university campus energy management twin:<\/strong> A university with 26 buildings across its main campus had individually accurate BIM models for each building, produced by different design teams over a 15-year construction programme, but no unified way to compare energy performance across buildings.<\/p>\n\n\n\n<p>The university implemented a campus-wide monitored digital twin (stage 3) that connected each building&#8217;s existing utility metering and BAS data into a single platform, using the existing BIM models as the spatial and asset foundation, without initially pursuing predictive or autonomous stages.<\/p>\n\n\n\n<p>The unified live view revealed that four buildings, representing less than 20% of total campus floor area, accounted for nearly 40% of total campus energy consumption, a pattern invisible when each building&#8217;s utility data had been reviewed separately with no easy way to compare buildings directly. This directed the university&#8217;s capital energy-efficiency investment toward the four highest-consuming buildings first, rather than spreading a limited budget evenly across all 26 regardless of actual need, a targeting decision the static BIM models alone wouldn&#8217;t have supported.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<p><strong>Can a digital twin exist without a BIM model?<\/strong> Technically yes, a digital twin can be built directly from sensor data or a simplified 3D representation without a full BIM authoring process. For buildings specifically, a twin built on an accurate, element-classified BIM foundation is substantially more useful, since BIM provides the spatial and asset context, which specific duct, which specific chiller, that makes live sensor data meaningful rather than just a stream of unattached numbers.<\/p>\n\n\n\n<p><strong>Does every building need a digital twin?<\/strong> No. The value of a digital twin scales with a building&#8217;s operational complexity, criticality, and scale. A well-maintained, connected BIM model is genuinely sufficient for many buildings&#8217; ongoing facilities needs. Small, simple buildings with modest energy spend and no critical equipment often don&#8217;t generate enough operational risk to justify the sensor and platform cost.<\/p>\n\n\n\n<p><strong>How much does it cost to move from a static BIM model to a monitored digital twin?<\/strong> Cost varies with building size, how many systems are monitored, existing building automation system capability, and analytics platform sophistication. As a general pattern, a monitored twin (stage 3) is driven primarily by sensor and integration hardware, while a predictive twin (stage 4) adds meaningful software and data science cost on top. Scope a specific pilot, often starting with the highest-value critical equipment, rather than attempting a full-building deployment first.<\/p>\n\n\n\n<p><strong>Is &#8220;digital twin&#8221; just a marketing term for what used to be called a BMS?<\/strong> There&#8217;s real overlap, and some products marketed as digital twins are, in substance, a building management system or CMMS with a 3D visualisation layer added. The meaningful distinction is whether the platform is genuinely connected to an accurate, element-level <a href=\"https:\/\/simutecra.com\/blogs\/scan-to-bim-existing-conditions-guide\/\" data-type=\"link\" data-id=\"https:\/\/simutecra.com\/blogs\/scan-to-bim-existing-conditions-guide\/\">3D model derived from BIM<\/a>, and whether it supports the predictive or bidirectional-control capabilities described above, rather than only displaying current sensor readings on a floor plan.<\/p>\n\n\n\n<p><strong>Who should own a digital twin implementation within a facilities organisation?<\/strong> This typically sits with the facilities management or operations team, since a digital twin is fundamentally an operational tool, but it should be planned in coordination with whoever managed the original BIM delivery to ensure the foundation is accurate and well-classified. Larger or more technically ambitious programmes, particularly those pursuing predictive or autonomous capability, often add a dedicated data or analytics role, since building and maintaining predictive models requires data science skills traditional BIM or facilities roles don&#8217;t typically include.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Campus-wide-digital-twin-dashboard-showing-26-buildings-ranked-by-energy-consumption-with-four-outlier-buildings-highlighted.png\" alt=\"Campus-wide digital twin dashboard showing 26 buildings ranked by energy consumption with four outlier buildings highlighted\" class=\"wp-image-976\" srcset=\"https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Campus-wide-digital-twin-dashboard-showing-26-buildings-ranked-by-energy-consumption-with-four-outlier-buildings-highlighted.png 1536w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Campus-wide-digital-twin-dashboard-showing-26-buildings-ranked-by-energy-consumption-with-four-outlier-buildings-highlighted-300x200.png 300w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Campus-wide-digital-twin-dashboard-showing-26-buildings-ranked-by-energy-consumption-with-four-outlier-buildings-highlighted-1024x683.png 1024w, https:\/\/simutecra.com\/blog\/wp-content\/uploads\/2026\/10\/Campus-wide-digital-twin-dashboard-showing-26-buildings-ranked-by-energy-consumption-with-four-outlier-buildings-highlighted-768x512.png 768w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Key Takeaways<\/h2>\n\n\n\n<p>The university engineering building had an accurate BIM model and still spent four days manually diagnosing a problem a monitored digital twin would have flagged within days. The hospital and campus examples show what changes when a live, data-connected layer is added on top of an accurate model foundation: not a replacement for BIM, but a genuinely new capability a static model, however accurate, was never designed to provide. In every case, the BIM model remained useful and necessary, both as the design and construction record and as the foundation the digital twin was built on.<\/p>\n\n\n\n<p>This is the relationship worth remembering past the terminology: BIM answers what a building was designed and built to be, and a digital twin answers what that building is actually doing right now and, at its most capable, what it&#8217;s likely to do next, consistent with the maturity framework defined by the <a href=\"https:\/\/www.digitaltwinconsortium.org\/initiatives\/the-definition-of-a-digital-twin\/\" target=\"_blank\" rel=\"noopener\">Digital Twin Consortium<\/a>. Neither replaces the other, and the strongest operational outcomes came from treating the digital twin as the next stage built on a solid BIM foundation, not as a competing technology chosen instead of one.<\/p>\n\n\n\n<p>Owners and facilities teams evaluating this decision are best served by being precise about which of the five evolution stages their building currently occupies, and which specific operational problem the next stage of investment would actually solve, rather than pursuing &#8220;a digital twin&#8221; as an undifferentiated technology goal disconnected from the operational reality their facilities team is actually managing day to day.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A university&#8217;s facilities team, managing a newly completed engineering building, pulled up the project&#8217;s handover BIM model to investigate a complaint about uneven temperatures on the third floor. The model showed exactly what it was designed to show: the HVAC system&#8217;s design specification, the ductwork layout, and the as-built equipment schedule, accurate as of the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":975,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,1],"tags":[39,36,197,24],"class_list":["post-972","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-3d-modeling","category-blog","tag-3d-modeling","tag-bim","tag-digital-twins","tag-mechanical-engineering"],"_links":{"self":[{"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/posts\/972","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/comments?post=972"}],"version-history":[{"count":3,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/posts\/972\/revisions"}],"predecessor-version":[{"id":978,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/posts\/972\/revisions\/978"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/media\/975"}],"wp:attachment":[{"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/media?parent=972"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/categories?post=972"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/simutecra.com\/blog\/wp-json\/wp\/v2\/tags?post=972"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}